Starting condition
The reference should show what existed before work: old layers, access, damage, substrate, moisture or unfinished details.
Translated reference case for foreign owners: multi-phase house renovation showing tile work, drywall, insulation, interior doors, furniture assembly and finishing details.
What a reference must document for a remote owner
A useful reference shows the condition before work, not only the final photo.
The reference should show what was done, which hidden risks existed and how the work was controlled.
Photos, phase notes and handover logic are stronger than generic “nice work” claims.
A useful reference for a remote owner must explain condition, scope, risk, control and handover, not only show the final photo.
The reference should show what existed before work: old layers, access, damage, substrate, moisture or unfinished details.
It must be clear which work was included and which decisions were left outside the agreed scope.
Remote owners need to understand what could change price or timing: access, hidden layers, materials, logistics or applies.
Photos and notes during work show that hidden phases were controlled before they were covered.
Completion should be documented with photos, notes and a clear handover point.
For a similar property, send photos and the goal first. A price without scope is not a controlled estimate.
What to send before asking for a price
Town, street or area, floor level, parking/access information and whether someone can open the property.
Wide shots of rooms, details, damage, existing tiles/floors/walls, installations and any hidden-risk areas.
Tell us if this is a rental preparation, family use, sale preparation or a seasonal upgrade, and when it must be ready.
State what is fixed, what is optional, and whether 1440MM should estimate only labour or labour plus selected logistics.
Translated reference case for foreign owners: multi-phase house renovation showing tile work, drywall, insulation, interior doors, furniture assembly and finishing details.
This translated case is used as reference of 1440MM processs quality: preparation, tile work, drywall/insulation logic, interior details, doors, furniture assembly and final finishing. It is not presented as a Dalmatian project; it is reference of how the work is documented.
larger renovation scope must be phased, not improvised
tile, floor, drywall and finishing works depend on previous layers
furniture and final installation details affect usability
This page summarizes the key scope, decision points and next step before an estimate or work agreement.
This translated case is used as reference of 1440MM processs quality: preparation, tile work, drywall/insulation logic, interior details, doors, furniture assembly and final finishing. It is not presented as a Dalmatian project; it is reference of how the work is documented.
larger renovation scope must be phased, not improvised
tile, floor, drywall and finishing works depend on previous layers
furniture and final installation details affect usability
photos through phases are stronger reference than a single final image
Choose the page that matches your property, project stage or preferred way to send an inquiry.
This section shows additional project context through preparation, tile work, installation, furniture fitting and final condition.

Preparation and installation phase.

Large floor tile area.

Interior door installation.

Wardrobe installation.

Finished kitchen.

Finished living space.